Anchoring Clamp STB 2×16 / 2×25 mm² | Wedge Type Dead-End Tension Clamp for ABC Cable

Key Features

  • Self-adjusting wedge system ensures a strong and stable cable grip
  • Suitable for duplex ABC cable configurations (2-core)
  • Tool-free installation reduces field installation time
  • UV-resistant body ensures long outdoor service life
  • High mechanical strength for safe tension applications
  • Compact design for easy handling and pole mounting

The PA2000-STB anchoring clamp is designed for secure tensioning and dead-ending of 2-core insulated ABC cables such as 2×16 mm² and 2×25 mm² in overhead distribution systems. Its wedge-type self-locking mechanism provides a strong gripping force without damaging cable insulation, ensuring safe and stable performance on poles and wall-mounted structures.

This anchoring clamp is made from UV-resistant fiberglass-reinforced thermoplastic with durable engineering plastic wedges and a corrosion-resistant steel bail. It offers high mechanical strength and long service life in outdoor conditions. The tool-free installation design reduces labor time and allows quick deployment in field applications.

Suitable for low-voltage power distribution, rural electrification, and urban network installations, it delivers reliable performance with minimal maintenance requirements.

International Standard Compliance

  • NF C 33-042: Ensures safe and reliable aerial cable performance
  • ISO 9001 Quality System: Controlled manufacturing process
  • RoHS Compliant: Environmentally safe material usage
  • Global Utility Standards: Suitable for international distribution networks

Construction & Materials

  • Fiberglass Reinforced Body: High strength with lightweight structure
  • UV-Resistant Thermoplastic: Prevents cracking under sunlight exposure
  • Engineered Plastic Wedges: Secure gripping without cable damage
  • Steel Bail (Galvanized/Stainless): Corrosion-resistant for outdoor use
  • Weatherproof Structure: Designed for harsh environmental conditions

Installation Guide

  • Cable Positioning: Place the 2-core ABC cable inside the clamp body properly
  • Wedge Locking: Insert wedges to securely grip both conductors
  • Clamp Mounting: Fix the clamp to the pole bracket, hook, or fitting
  • Tensioning: Apply controlled tension until the clamp locks firmly
  • Final Check: Ensure alignment and secure holding before commissioning